5th Floor.
Brick wall and wood
frame construction. On the left side there is an abandoned waste pipe
embedded in the brick wall.
The floor has been chopped away in this area to accommodate under- floor waste
piping from a demolished bathroom, leaving the floor structure weakened.
|